Short Summary
The Court of Appeal of the Unified Patent Court rejected Polytechnik's application for suspensive effect of an order by the Copenhagen Local Division compelling it to produce construction drawings and operation/maintenance manuals in patent infringement proceedings brought by Dall Energy concerning EP 2 334 762. The Court held that Polytechnik failed to demonstrate exceptional circumstances justifying a stay, finding that the confidentiality protections in the order were adequate and that the alleged prejudice did not meet the threshold of a breach of fundamental procedural rights.
Detailed Summary
This case concerns an application for suspensive effect under Rule 223 RoP filed by Polytechnik Luft- und Feuerungstechnik GmbH (Austria) against an order of the Copenhagen Local Division of the Unified Patent Court dated 10 April 2026, issued in patent infringement proceedings (UPC_CFI_513/2025) brought by Dall Energy ApS (Denmark) regarding European Patent EP 2 334 762.
The impugned order, issued by the judge-rapporteur following an interim conference, required Polytechnik (the Defendant) to produce within two weeks, subject to a penalty payment of up to EUR 1,000 per day of delay, the following documents: (a) complete construction drawings of the furnace at the Oberpullendorf site; (b) complete construction drawings of Polyheld furnaces supplied to other sites; and (c) Operation and Maintenance (O&M) manuals and other materials provided to customers relating to the Polyheld. The order restricted access to the information to Dall's legal representatives and their team members, who were required to treat the information as strictly confidential.
The Local Division granted Dall's Application for Production of Evidence under Rule 190 RoP, finding that Dall had provided reasonably available and plausible evidence of infringement. Polytechnik had contended that the Polyheld device was technically incompatible with the claimed features, asserting it did not reach the 400°C threshold during drying and that its lateral combustion stage prevented heat transfer. The Local Division found the requested disclosure essential for Dall to rebut Polytechnik's new technical narrative.
On 20 April 2026, Polytechnik filed an appeal and sought suspension of the order's effect, arguing: (1) immediate enforcement would cause irreparable harm by permanently exposing core technical know-how; (2) the protective measures were insufficient because patent attorneys and lawyers involved in Dall's patent prosecution should be excluded, and decision-makers should also be barred; (3) the order would result in a factual pre-judgment of the case by compelling disclosure typically only available after a finding of liability; and (4) granting suspensive effect was indispensable to preserve the effectiveness of appellate proceedings without comparable prejudice to Dall.
Dall opposed the application, arguing it failed to state specific reasons, that the impugned order was not manifestly erroneous, and that Polytechnik misinterpreted the order.
The Court of Appeal (Panel 1b: Klaus Grabinski, Paolo Catallozzi, Emmanuel Gougé) found the application admissible under Article 73(2) UPCA and Rule 220.1(c) RoP, but rejected it on the merits. The Court applied settled case law holding that suspensive effect is only granted in exceptional circumstances that justify an exception to the principle in Article 74(1) UPCA, with particular force for procedural orders. The Court identified two categories of circumstances justifying suspensive effect: (1) where the appeal would be rendered devoid of purpose because consequences cannot be effectively reversed, and (2) where the impugned order is manifestly wrong based on clearly untenable factual or legal considerations.
Regarding serious and irreparable harm, the Court found that the confidentiality protections in the order were adequate. The Court clarified that the reference to 'legal representatives and their team' unambiguously refers to lawyers authorized to practise before a court of a Contracting Member State and European Patent Attorneys entitled to act as professional representatives before the EPO under Article 134 EPC holding appropriate qualifications such as a European Patent Litigation Certificate, who may represent parties under Article 48 UPCA. The order therefore prohibits sharing confidential information with the Claimant itself. The Court also noted that Rule 262A.6 RoP governs the size of the confidentiality club, and Polytechnik made no specific submissions on this point.
Regarding the alleged risk of factual pre-judgment, the Court found that Polytechnik failed to clarify precisely why disclosure would prejudice its rights or why such prejudice would necessitate a stay. The Court held that the alleged prejudice did not meet the threshold of a breach of fundamental procedural rights, noting that the UPC procedural system follows the opposite principle—that all facts and evidence must be adduced as early as possible, ideally during the written procedure—to ensure fair proceedings. This is further confirmed by Rule 222 RoP, which limits appeal proceedings to the subject-matter of the first-instance proceedings.
The Court concluded that Polytechnik's interest in avoiding enforcement did not outweigh Dall's interest in having the documents adduced as evidence, and rejected the application for suspensive effect.
Practitioner Note
This case demonstrates the evidentiary and procedural standards applied in patent matters before Luxembourg (LU). Understanding the court's reasoning in Polytechnik Luft- und Feuerungstechnik GmbH vs Dall Energy ApS is valuable context for structuring arguments or assessing risk in similar proceedings.
Related Cases
Rematec GmbH & Co KGvsEurope Forestry B.V.
The Court of Appeal of the Unified Patent Court refused leave to appeal against an order of the Local Division Mannheim that had rejected Rematec's two cost determination applications as time-barred and dismissed its applications for reinstatement. The Court held that an application for leave to appeal under Rule 157 in conjunction with Rule 221 of the Rules of Procedure is inadmissible insofar as it is directed against the rejection of a reinstatement application, since Rule 320.7 expressly precludes appeals against orders on reinstatement. The Court also rejected Europe Forestry's request to impose costs on Rematec, noting that cost reimbursement is generally not available in cost determination proceedings.
Rematec GmbH & Co KGvsEurope Forestry B.V.
The Court of Appeal of the Unified Patent Court refused leave to appeal against an order of the Local Division Mannheim that had rejected Rematec's two cost determination applications as time-barred and denied reinstatement into the missed deadlines. The Court of Appeal held that an application for leave to appeal under R. 157 and R. 221 RoP is inadmissible insofar as it challenges the rejection of a reinstatement application, because R. 320.7 RoP expressly excludes appeals against orders on reinstatement. No arguable grounds for leave to appeal were identified regarding the rejection of retroactive deadline extension requests.
Promosome LLC and The Scripps Research InstitutevsBioNTech SE, BioNTech Manufacturing GmbH, BioNTech Manufacturing Marburg GmbH, BioNTech Innovative Manufacturing Services GmbH, BioNTech Europe GmbH, Pfizer Manufacturing Belgium NV, Pfizer SAS, Pfizer AB, and Pfizer, Inc.
This order of the Court of Appeal of the Unified Patent Court concerns three appeals (UPC-CoA-146/2026, UPC-CoA-147/2026, and UPC-CoA-148/2026) relating to EP 2 401 365. The appellants, Promosome LLC and The Scripps Research Institute, sought a one-month extension of the deadline for lodging their Statements of grounds of appeal, citing heavy professional workload and school holiday periods. Both groups of respondents (BioNTech and Pfizer entities) opposed the extension. The Court of Appeal rejected the applications, holding that the circumstances relied upon were foreseeable and did not justify an extension of the procedural time period.
Kodak Holding GmbH, Kodak GmbH, Kodak Graphic Communications GmbHvsFujifilm Corporation
This is a procedural order from the Court of Appeal of the Unified Patent Court concerning European Patent EP 3 511 174. The Respondents (Kodak entities) requested a one-week extension of the deadline to file written comments on the Applicant's (Fujifilm's) request for rehearing. The Court granted the extension until 23 October 2026, finding the request admissible and well-founded because the Applicant had consented, the extension was brief, and the Respondents' representatives had been occupied preparing for a related oral hearing before the Düsseldorf Regional Court that was postponed shortly before the application was filed.
Huawei Technologies Co. Ltd.vsSercomm Italia SRL
This is a procedural order from the Local Chamber Munich of the Unified Patent Court concerning alternative service of process on Sercomm Italia SRL in a patent infringement action involving European Patent EP 3 611 989 B1. After multiple failed attempts to serve the Italian defendant at its registered business address, the rapporteur had previously ordered under Rule 275.2 RoP that the prior service measures constituted valid service. The present order addresses the fact that notification of that earlier order was unsuccessful and directs additional means of notification to ensure the defendant is informed.
Network System Technologies LLCvsQualcomm Incorporated, Qualcomm Technologies, Inc., Qualcomm Germany GmbH
The Court of Appeal of the Unified Patent Court rejected Network System Technologies LLC's (NST) applications for re-establishment of rights under R. 320 RoP. NST had sought to revive its late-filed appeals against the rejection of its R. 190 Applications (production of evidence) in three infringement proceedings against Qualcomm before the Munich Local Division. The Court held that NST failed to demonstrate that all due care had been taken, as the circumstances cited did not constitute exceptional circumstances or excusable error under the precedent set in AIM v Supponor.
Dealing with a patent challenge?
Whether it's a Section 3(d) rejection, a post-grant opposition, or a FRAND dispute, Arctic's patent litigation team has handled it. Get a strategy call.
Disclaimer: This page contains an automated summary based on publicly available judicial records. The content is generated for informational purposes only and does not constitute legal advice. Always verify details against the original source judgment before relying on this information for any legal purpose. If you believe any information is inaccurate, please contact us.